Guardian Equipment GFR3110 Eyewash Station

SKU: GFR3110
(1 customer review)

The Guardian Equipment GFR3110 is a floor-mounted emergency eyewash and shower safety station with a bottom intake for usage in Class 1 Division 2. It includes a BS plastic shower head with an internal flow control of 20 GPM and a 1″ IPS brass stay-open ball valve manufactured in the United States with a stainless steel actuating arm. Additionally, it features a 12″ IPS brass three-way self-draining stay-open ball valve manufactured in the United States, 114″ IPS Schedule 40 hot-dipped galvanized pipe and fittings, polished stainless steel pull rod, stainless steel flag handle, powder-coated cast aluminum floor flange, and self-regulating electric heat-traced cable. Additionally, it features a UV-resistant ABS plastic jacket with a foam-insulated core and an elastomeric weather seal, as well as a 120VAC, 60 HZ single-phase power supply and a pipe detecting thermostat. The unit’s spray heads shall be freeze-resistant and equipped with dust coverings. Mounting spray heads on a chrome-plated brass eyewash assembly is required. The unit shall be equipped with ANSI-compliant signage.

The unit shall be completely assembled, pressure tested, crated, and tested to comply with or exceed the requirements of ANSI Z358.1-2014. The item is backed by a full two-year warranty.

Hazardous Area Rating

$5,23387

Shipping Time: 6 -7 weeks

Need faster options? Contact our Hazardous Areas Experts now for quick alternatives!

Trusted Clients

  • Logo PH66
  • Logo  Exxon
  • Logo Bp
  • Logo Conoco Phillipis
  • Logo Irwing
  • Logo Bayer
  • Logo Tesoro
  • Logo Northen TIer
  • Logo Udelhoven
  • Logo Aloha petroleum
  • Logo Rand
  • Logo Arrow Energy
  • Logo Schlumber
  • Logo Afton
  • Logo Holly frontier
Similar Category:

Features:

  • Class I Division 2
  • Floor mounted electrically heat traced emergency eyewash station with bottom inlet
  • Electric heat-traced stations prevent freezing even in extreme conditions
  • Units are intended for cold weather use down to -40°F
  • Self-regulated with external termination guards
  • The thermostat activates when the internal piping temperature falls below 75°F.
  • Requires 120 VAC single phase power supply
  • UV-resistant orange ABS plastic with polyethylene foam insulation
  • 10” diameter orange ABS plastic with 20 GPM flow control
  • US-made with brass ball and PTFE seals

Application: Electric heat-traced stations prevent freezing even in extreme conditions. Thermostat-regulated units are heated by a self-limiting heat-tracing cable wrapped around the internal pipe. Units are intended for cold weather use down to -40°F. See ‘Tempering Valves’ section to ensure tepid water compliance with ANSI Z358.1-2014.

Heating Cable: Self-regulated with external termination guards. The thermostat activates when the internal piping temperature falls below 75°F. FM, UL, and CSA approved for Class I, Division 2, Groups B, C, and D.

Electrical System: The unit is fully wired at the factory. Junction box and components rated for Class I, Division 2, Groups B, C, and D. Requires 120 VAC single-phase power supply.

Jacket/Insulation: UV-resistant orange ABS plastic with polyethylene foam insulation. Jacket sections are secured with removable stainless steel screws for easy maintenance.

Shower Head: 10” diameter orange ABS plastic with 20 GPM flow control.

Shower Valve: 1” IPS brass stay-open ball valve. US-made with brass ball and PTFE seals. Includes stainless steel actuating arm and 29” stainless steel pulls rod.

Spray Head Assembly: Freeze-resistant with float-off dust covers and internal flow control.

Eyewash Valve: 1/2” IPS brass three-way self-draining stay-open ball valve. US-made with brass ball and PTFE seals. Includes 1/2” NPT port to drain water from spray heads after use.

Pipe And Fittings: Schedule 40 galvanized steel.

Supply: 1-1/4” NPT female bottom inlet.

Sign: ANSI-compliant identification sign.

Quality Assurance: Factory tested prior to shipment. Ships fully assembled and crated.

Shipping: For this specialized unit, expect lead time to be around 6-7 weeks

Resources:

More Options For You:

Reviews & Questions

Share your thoughts!

5 out of 5 stars

1 review

Let us know what you think...

What others are saying

  1. Offshore RigMan88

    Offshore RigMan88

    Came at the time we really need it. It is below freezing in where we work at and this equipment has saved us in many situations. This GFR3110 from Guardian Equipment is highly engineered and very reliable for Class 1 Division 2 use.

    Upvote if this was helpful (0) Downvote if this was not helpful (0) Flag for removal

    Something wrong with this post? Thanks for letting us know. If you can point us in the right direction...

×

Login

Continue as a Guest